• aluminium rail for solar panel mounting Manufacturers, aluminium rail for solar panel mounting Factory, Supply aluminium rail for solar panel mounting
  • video
aluminium rail for solar panel mounting
  • MG SOLAR
  • XIAMEN, CHINA
  • Within 7 days
  • 3000m/Week
  • 1m
  • US $ 3.1~3.27/ m

*aluminium rail for solar panel mounting
*aluminum 6005-T5
*universal

aluminium rail for solar panel mounting

aluminium rail for solar panels


Product Description


Installation Site: Roof Mount    

Wind Load:  60m/s   

Snow Load: 1.4kN/m2

Material: Aluminum Alloy 6005-T5 

Warranty: 10 years on material


Features

1) Easy to install. The tilt-in module can be put into the extruded rail from the any location and can be high pre-assembly with the clamp and roof hook to minimize the time and cost of installation


2) Offer unmatched durability. With all structural components comprised of high class stainless steel and anodized aluminum alloy, it is designed for twenty years service life and backed by ten years warranty.


3) Stand up to extreme weather. The pitched roof racking system is designed to stand up to the extreme weather complied with the AS/NZ 1170 and other international structure load standard by the skilled engineer. The main support components also have been test to guaranty its structure and load-carrying capacity.


4) Provide broad installation flexibility. These systems accommodate most commercially available framed solar panels and diverse roof types, and they can scale easily from small to large, multi-megawatt installations.


Details

aluminium solar mounting rail


Design Picture

aluminium solar panel rail


Packaging & Shipping


Packaging Details

Cartons, wooden or metal pallets.

Delivery Time

within 10 days after receiving 30% deposit

aluminium rail for solar panels


Why Choose US

·    Design conformable to different on-roof project requirements

·    Fast and cost effective installation, easy to be assembled on different roof tops

·    Short in 7 days leading time

·    Wisely solutions for your solar PV projects


Project Reference

aluminium solar mounting rail


Related Products

aluminium solar panel rail


FAQ


Q  :  Can I have a sample order of Aluminum Corrugated Metal Roof Solar Mounting ?

A  :   Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q  :  What about the lead time?

A  :  Sample needs 3-5 days, mass production time needs 10~20 days for order quantity more than. 

Q  :  Do you have any MOQ limit ?

A  :  For normal products,we provide low MOQ, 1pc for sample checking is available.

Q  :  How do you ship the goods and how long does it take to arrive?

A  :  For small products,we usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-7 days to arrive. For big orders,we usually ship by sea,it will take 7~30days to arrive, depend on distance.

Q  :  How to proceed an orders?

A  :  Firstly let us know your requirements or application.Secondly We quote according to your requirements or our suggestions.Thirdly customer confirms the samples and places deposit for formal order.

Q  :  Is it OK to print my logo on products?

A  :   Yes. Please inform us formally before our production and confirm the design firstly based on our sample.

Q  :  Do you offer guarantee for the products?

A  :   Yes, we offer 10 years to solar mounting system.


Please feel free to contact us, if there is anything we can do for you !



Have a question, need help designing a system or just want to know more about MG Solar? Feel free to contact us by email or toll-free call.
close left right