• Solar Racking Thin Film Mid Clamps
  • Solar Racking Thin Film Mid Clamps
  • Solar Racking Thin Film Mid Clamps
  • video
Solar Racking Thin Film Mid Clamps
  • MG Solar
  • China
  • Within 7 days
  • 30,000 pcs/Day
  • 1PC
  • $US 0.48~1.49/Piece

* High class anodized aluminum
* Easy to install
* Pre-assembled

Solar Racking Thin Film Mid Clamps

Solar Racking Thin Film Mid Clamps

Products  Details

Choose from a wide range of solar presses. They all feature high quality, high strength and cost efficiency. We hope that our products will meet your needs.


Item No.DescriptionMaterial 
MG-TF-MC-80Thin Film Mid Clamp, 80 mmAluminum 6005-T5 & SUS304
MG-TF-MC-120Thin Film Mid Clamp, 120 mmAluminum 6005-T5 & SUS304


Specifications:

ITEM NO.DESCRIPTIONLENGTH(mm)MATERIALPICTURE
MG-TF-MC-80Thin Film Mid Clamp,80mm80mmAL6005-T5 & SUS304 
MG-TF-MC-120Thin Film Mid Clamp,120mm120mm
MG-TF-MC-150Thin Film Mid Clamp,150mm150mm
MG-TF-MC-200Thin Film Mid Clamp,200mm200mm
 MG-TF-MC-80Thin Film Mid Clamp,80mm 80mm AL6005-T5 & SUS304     
 MG-TF-MC-120Thin Film Mid Clamp,120mm 120mm
 MG-TF-MC-150Thin Film Mid Clamp,150mm 150mm
 MG-TF-MC-200Thin Film Mid Clamp,200mm 200mm


Details Show

Solar Racking Thin Film Mid Clamps


Drawings



thin film mid clamp

Payment Terms

Payment TermsT/T
EXW
30% as deposit, the balance before shipment 
FOB
CIF
DDP/DDU


Why Choose US


·    Faster installation which saves your labor cost.

·    Quick and cost effective installation, easy to install on different roofs

·    Short in 7 days leading time

·    Wisely solutions for your solar PV projects


FAQ


Q  :  How to make customers trust your company?

A  :   We have our own factory, all products are made in China, and we have a credit guarantee from Alibaba Group, so you can place orders directly with us through Alibaba..

Q  :  What about the lead time?

A  :  Samples are completed in 3-5 days, mass production takes 10-20 days and orders take more than 20 days.

Q  :  Do you provide samples  ?

A  :  Yes, we could offer the sample with the best discount.

Q  :  How do you ship the goods and how long does it take to arrive?

A  :  For small products,we usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-7 days to arrive. For big orders,we usually ship by sea,it will take 7~30days to arrive, depend on distance.

Q  :  How to proceed an orders?

A  :  Firstly let us know your requirements or application.Secondly We quote according to your requirements or our suggestions.Thirdly customer confirms the samples and places deposit for formal order.

Q  :  Is it OK to print my logo on products?

A  :   Yes, please inform us officially before production and confirm the design based on our samples.

Q  :  Do you offer guarantee for the products?

A  :   Yes, we offer 10 years to solar mounting system.


Related Products


Solar Mounting Clamp


Please feel free to contact us, if there is anything we can do for you !






Have a question, need help designing a system or just want to know more about MG Solar? Feel free to contact us by email or toll-free call.

Privacy policy

close left right