Home > Products > Solar Roof Racking System > Solar Metal Roof Mounting System

Solar Metal Roof Mounting System

Brand : MG Solar

Product origin : China

Delivery time : Within 7 days

Supply capacity : 5MW/Week

MOQ : 1KW

Product Description


1.Technical Parameters

Installation Site: Metal Roof         Wind Load:  130mph(60m/s)     Snow Load: 30psf(1.4kN/m2)

Material: Aluminum Alloy 6005-T5 & Stainless Steel 304     Warranty: 10 years on material


2. Features and Benefits

1) Easy to install. The tilt-in module can be put into the extruded rail from the any location and can be high pre-assembly with the clamp and roof hook to minimize the time and cost of installation
2) Offer unmatched durability. With all structural components comprised of high class stainless steel and anodized aluminum alloy, it is designed for twenty years service life and backed by ten years warranty.
3) Stand up to extreme weather. The pitched roof racking system is designed to stand up to the extreme weather complied with the AS/NZ 1170 and other international structure load standard by the skilled engineer. The main support components also have been test to guaranty its structure and load-carrying capacity.

4) Provide broad installation flexibility. These systems accommodate most commercially available framed solar panels and diverse roof types, and they can scale easily from small to large, multi-megawatt installations.



Overview of system components                


blob.png

blob.png

 

blob.png

 

blob.png

blob.png

blob.png

MG-TR-LFM-01MG-TR-LFM-02MG-TR-HB-01MG-TR-HB-02MG-SS-RM-03

MG-SS-RM-06

blob.png     blob.pngblob.png     blob.pngblob.png   blob.pngblob.png     blob.png
        blob.png

Mid Clamp    End Clamp

Adjustable Mid     Clamp & End Clamp

Thin Film Mid Clamp   Thin Film End Clamp

     Roof Rai         lRail Connector

MG-SS-RM-01



Packaging & Shipping


image.png


Packaging Details

Cartons, wooden or metal pallets.

Delivery Time

within 10 days after receiving 30% deposit




Payment Terms


Payment TermsT/T
EXW
30% as deposit, the balance before shipment 
FOB
CIF
DDP/DDU



Why Choose US


·    Design conformable to different on-roof project requirements

·    Fast and cost effective installation, easy to be assembled on different roof tops

·    Short in 7 days leading time

·    Wisely solutions for your solar PV projects



FAQ


Q  :  Can I have a sample order ?

A  :   Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

 

Q  :  What about the lead time?

A  :  Sample needs 3-5 days, mass production time needs 10~20 days for order quantity more than. 

 

Q  :  Do you have any MOQ limit ?

A  :  For normal products,we provide low MOQ, 1pc for sample checking is available.

 

Q  :  How do you ship the goods and how long does it take to arrive?

A  :  For small products,we usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-7 days to arrive. For big orders,we usually ship by sea,it will take 7~30days to arrive, depend on distance.

 

Q  :  How to proceed an orders?

A  :  Firstly let us know your requirements or application.Secondly We quote according to your requirements or our suggestions.Thirdly customer confirms the samples and places deposit for formal order.

 

Q  :  Is it OK to print my logo on products?

A  :   Yes. Please inform us formally before our production and confirm the design firstly based on our sample.

 

Q  :  Do you offer guarantee for the products?

A  :   Yes, we offer 10 years to solar mounting system.



Please feel free to contact us, if there is anything we can do for you !



Related Products


Related Products.jpg


Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
Message